Engineering Services

OEM Integration & Applications Engineering

Beam path simulation, source-family selection, PLC and safety interface review, and ISO 11146-grade beam quality documentation for machine builders integrating IPG fiber laser modules into cutting, welding, marking, and cleaning cells.

Service capability matrix

ServiceKey parameter
Beam Profiler CalibrationISO 11146 measurement practice with M2 and beam waist documentation
Field Engineer Dispatch48-hour global support target, 24-hour response in selected tier-1 industrial regions
Wear Parts and Optics ReviewCollimator, process window, nozzle, delivery fiber, and back-reflection exposure review
PLC Integration ServiceDigital I/O, analog command, Ethernet service layer, OPC UA or Profinet bridge planning
On-line Power CalibrationWarm-up curve, eight-hour drift observation, and acceptance-test record for production cells
Documentation PackFAT / SAT template, IEC 60825 risk support file, EN / DE / JP handover notes when required

Integration methodology

  1. 1. Discovery Workshop

    Application brief, material range, throughput target, spot-size envelope, and safety classification are captured before source power is recommended.

  2. 2. Beam Path Simulation

    Optics choices are modeled against focal stability, back-reflection risk, fiber core diameter, and enclosure geometry.

  3. 3. Bench Build

    The source, delivery fiber, collimator, scanner or cutting head are assembled for first-light checks on a controlled test bench.

  4. 4. Cell Integration

    Machine controller mapping, interlock chain, chiller behavior, fume extraction, and service access are reviewed at the equipment level.

  5. 5. FAT Acceptance

    Witness testing verifies power stability, beam profile, process coupon output, and operator handover documentation.

  6. 6. SAT On-Site

    Re-validation confirms that shipping, plant utilities, chiller settings, and production duty cycle have not shifted the source out of tolerance.

Engineer-to-engineer review of your integration spec

Send a one-page cell brief, material range, controller platform, and planned optics stack. We will respond with a source class, interface checklist, and FAT outline.